| Like many other small
and midsized businesses, San Jose Medical Group in California needed to upgrade its
computer system to keep up with increasing computer needs. So, in the summer of 1990, new
software and hardware were installed. The system interfaced with many of the clinic's key
administrative processes, such as patient scheduling, patient registration, charge entry,
insurance claims submission, and collections. In the months following the upgrade, the process of billing insurance companies
for payment deteriorated rapidly. The seriousness of the situation emerged when, after 120
days on the new system, accounts receivable had climbed by almost $1 million. By the
180-day point, accounts receivable had more than doubled compared to the pre-upgrade
level. Shortly after that, reduced cash flow began to threaten the clinic's existence.
Management had to act quickly to avert disaster.
It already had a process improvement effort under way to resolve an unrelated, but equally
critical, situation involving the movement of medical records between the main clinic and
eight branch offices. A quality improvement team (QIT) was formed to solve the problem.
Within 60 days, the medical records situation began to improve dramatically) Since the
same techniques that improved the movement of medical records could also be applied to the
deteriorating cash flow situation, management decided to form a second QIT.
The second Q1T consisted of executives, middle
managers, and line personnel. The team met for 90 minutes each week. Since the team
members weren't proficient in applying quality improvement techniques, an outside quality
improvement expert was retained to facilitate team meetings, provide statistical quality
control support, perform analyses, and train team members as needed.
The problem
Prior to upgrading the computer system, an in-house data entry department scrutinized
claims before sending them to the insurance companies for payment. After the upgrade, the
clinic contracted with a clearinghouse to perform this task. The clinic now sends its
claims electronically to the clearinghouse, which validates each data field on the claims
by applying tests to the data. The claims that pass the tests are forwarded to the
appropriate insurance carrier for payment. The ones that fail are returned to the clinic
within a day or two along with a note indicating why they were rejected. if the clinic
were to submit an erroneous claim directly to an insurance carrier, three to four weeks
would likely pass before the clinic would be notified of the error. By using the
clearinghouse, the entire process of reworking errors is accelerated.
Management believed, however, that the
clearinghouse was rejecting an abnormally high number of insurance claims. Therefore, the
QIT's initial meeting focused on the reasons why payment claims were being rejected. A
Pareto diagram was constructed showing the main reasons for payment rejections over a
two-week period (see Figure 1).2 The team concentrated on the "vital few" causes
displayed to the left of the 80/20 line (i.e., the causes of 80% of the rejections) and
concluded that the principal problem was incorrect patient insurance information (e.g.,
wrong policy number, wrong member number, or incorrect social security number). Since this
information was entered during the patient registration process, the team's corrective
action initially focused on improving the registration process.
In hindsight, the registration process was an obvious starting point in the improvement
effort. There are literally thousands of insurance companies, preferred provider
organizations, and health maintenance organizations (payors). Each provides its members
with identification cards displaying the insurance information in creative,
non-standardized formats.

Given the wide variety of identification card formats, it is difficult for the person
registering the patient to obtain the proper information. Therefore, the clinic had come
to routinely expect registration errors.
Prior to converting to the new computer system,
the clinic believed its claim rejection rate was about 4%. The new computer system,
however, did not generate reports regarding the clearing-house's claim rejection rate.
Thus, the QIT had to estimate the current rejection rate by manually tallying several
weeks' worth of claims. That exercise indicated that the clearinghouse rejection rate was
about 20%. Assuming the rejection rate of the tallied claims was generally accurate for
all claims submitted for payment, it meant the clinic was experiencing a fivefold increase
in claim rejections compared to the pre-upgrade average.
The team members decided their initial goal
should be to get the rejection rate back down to the pre-upgrade average of 4%. They also
decided that the process should be continuously monitored to verify that each change made
by the QIT resulted in an improvement. The QIT contemplated developing a run control chart
to distinguish special cause variation from common cause variation, but the computer runs
were too sporadic, and the necessary computer-generated data were not routinely
available.3 (Sometimes certain key programs weren't run for a week or more because of the
computer's slow processor speed and lack of disk space.) Rather than manually gathering
the data, the team opted to continue using only the Pareto diagram coupled with an
occasional manual calculation of the claim rejection rate. This approach meant revising
the Pareto diagram before each meeting so that it reflected only the output errors related
to the payment rejections received since the last meeting.
Since any one of more than 70 employees might
enter patient information at any one of more than 100 different terminals, the QIT
collected the payment rejections on a "by reason by location" basis. Location
information was tracked only at the branch level because the computer software wasn't
capable of tracking data entry information by user identification or terminal
identification. A check sheet was manually constructed and completed to summarize each
week's claim rejections. (Computer-generated reports showing such information were not
readily available.) The total listing of rejections by reason was then displayed in a
Pareto diagram at the team's weekly meeting. During the meeting, the team would brainstorm
and prioritize the possible causes for the various rejections. Action items were
developed, given due dates, and assigned to team members.
The stacked-bar Pareto diagram
At first, team members used only a single bar in the Pareto diagram. It wasn't long,
however, before they wanted more information displayed. This was understandable because
the basic Pareto diagram shows only one aspect of the data being tracked on the check
sheet. Only a count of rejections by location or a count of rejections by reason could be
shown-not both.

Since the team members had quickly grasped how to interpret the Pareto diagram, the
facilitator introduced them to the stacked-bar Pareto diagram shown in Figure 2. Whereas
the basic Pareto diagram ranks only one factor, the stacked-bar Pareto diagram ranks two.
The team readily grasped how to interpret this chart and found it much more useful than
the single-bar version because it showed both the count of rejections by location and the
count of rejections by reason.
The stacked-bar Pareto diagram became the primary
tool for monitoring the process's performance. It was easy to construct using the
available personal computer (PC) spreadsheet software. In fact, a macro was developed that
allowed a clerk with no knowledge of spreadsheets to transfer the most recent check sheet
counts to the PC spreadsheet and print the stacked-bar Pareto diagram prior to each QIT
meeting.
Unintentionally, one stacked-bar Pareto diagram
was printed in color. The team members reacted positively; they felt that the use of color
made it much easier to understand the displayed data. Co-workers also seemed to like the
colored chart better; they paid much more attention to it than they did the
black-and-white ones that were previously hung in their work areas. From then on, the
charts were always printed in color.
Improving the process
During the first few months of its existence, the team developed and implemented more than
100 action items. The initial action items focused on getting the new computer system to
better validate the information at the time of data entry. Although the data were entered
on-line, the new computer system wasn't able to check the data for much more than numeric
or alphanumeric content. Instead of verifying the data in real time, the system depended
on the clearinghouse to detect errors. Thus, no one in the clinic was notified of data
errors until several days after data entry. By then the patient was gone, and it was not
easy to correct the suspected information.
The team felt that, ideally, the software should have provided data validation feedback at
the time the patient was being registered. That way, if errors occur, they can be
corrected while the patient (and the patient's insurance card) are at the terminal and
still readily accessible. The fact that the new system didn't have this capability proved
disappointing to the team members because it increased the difficulty of their task.
Once the team members accepted that the computer
system could not be modified, they decided that the quickest way to improve was to make
every user an expert in the system's limitations and possible circumventions. Therefore,
the next phase of improvement action items was targeted at intensely training computer
users. Early in this phase, the process was flow-charted as shown in Figure 3. A training
program for employees was then developed.
Figure 3: Flowchart of the Clinic's Claim
for Payment Submission Process



The program was pilot tested in one location and then phased in at other locations.
Revisions were common during the early stages, and the training manual quickly grew to
more than 50 pages. This training program proved to be significantly better than the
initial one provided by the software supplier.
Verifying success
Team members were eager to see results, so each weekly meeting began with a review of the
most recent stacked-bar Pareto diagram. The team brainstormed the main causes for the
prior week's rejections and developed action assignments designed to prevent the problems'
recurrence. The team also reviewed the status of each open action item at least every
third meeting.
Collecting data to prove conclusively that the process was improving was difficult since
the computer software would intermix payment resubmissions with first-time submissions
(see Figure 3). In addition, the computer system reports, when available, did not
distinguish between rejections of the resubmissions and rejections of the first-time
submissions. The team was able to satisfy itself that incorrect patient insurance
information was no longer the leading reason for payment failure by manually screening the
rejections based on date of service and by using the stacked-bar Pareto diagram.
By the 12th week, the team began focusing its
attention on some of the original "useful many" causes of rejection (i.e., the
causes that initially accounted for only 20% of the rejections). By this time, the useful
many causes had moved up in the stacked-bar Pareto diagram because the other leading
causes were eliminated or controlled.
A plot of the clearinghouse's total number of
rejections during the first five months of the improvement effort showed a distinct
downward trend (see Figure 4). In fact, the total errors per month had fallen by more than
half of what they had been at the beginning of the improvement effort. Since this total
count of rejections included payment claims that were being reprocessed a second or third
time, the clinic's first-time error rate was presumed to be even lower.
The stacked-bar Pareto diagram produced for the
QIT's 20th meeting, however, displayed a sudden reversion back to the original causes for
rejection, but only within one branch. Investigation revealed that the source of the
errors was a part-time employee who was on vacation when the training was conducted. A
crash course for that person prevented the problems from recurring.
Throughout the improvement effort, an occasional manual calculation was performed to track
the rejection rate. By the 22nd week, these calculations indicated that the rejection rate
had indeed been reduced to 4%. The team members had achieved their goal. They did not,
however, terminate their efforts. Instead, they set a new goal: reduce the rejection rate
to 2% or less. As Figure 5 shows, the team eventually achieved that objective, and as a
result, the clinic achieved its lowest-ever rejection rate.
Pareto principle prevents disaster
Although the clinic's computer system upgrade almost meant disaster for the organization,
the quality improvement team was able to turn the tables by using the stacked-bar Pareto
diagram and other quality tools and techniques. Not only did the team reach its initial
goal of getting the rejection rate back to the preupgrade status, it also reduced the rate
to an all-time low.
References
-
James Shaw, "Making Quality Improvement Work," Group Practice Journal,
January/February 1992, pp. 6-23.
-
Ronald D. Moen and Thomas W. Nolan, "Process Improvement," Quality Progress,
September 1987, pp. 62-68.
-
Howard Gitlow, Shelly Gitlow, Alan Oppenheim, and Rosa Oppenheim, Tools and Methods for
the Improvement of Quality (Boston, MA: Richard D. Irwin, Inc., 1989), pp. 460-462.
Marti Benjamin was the director of marketing at
San Jose Medical Group, Inc. in San Jose, CA. She currently is a manager of ambulatory
care at Lucile Salter Packard Children's Hospital in Stanford, CA. She received a
bachelor's degree in management from Marylhurst College in Marylhurst OR.
James G. Shaw is the principal of Shaw Resources. He received a degree in physics from the University of California at
Riverside and master's degree in business administration from the University of California
at Berkeley. Shaw is a member of ASQC and a past senior examiner member of the Board of
Examiners for the Malcolm Baldrige National Quality Award.
Copyright © 1993 by Shaw Resources, Cupertino,
CA. All rights reserved.
First published in the September 1993 issue of Quality Progress, pg 103-107
Reprinted in cooperation with the American Society for Quality.
| Copyright © Shaw Resources, 2006, all rights reserved.
(888-SHAWRES), email: Info@ShawResources.com; www.ShawResources.com. You may reproduce this
article provided: 1) each copy you generate is of the article in its entirety, without
modification of any kind; 2) you receive no fee whatsoever; and 3) this copyright and
permission notice, including the contact information, must be prominently displayed on
each copy produced. |
|